Keeping tradition with doing things backwards, I’ve finally got a UPS for the rack (mounted in the bottom of the stack). Got a PowerWalker VI 2200R. Its a 2U unit which is all the space I’ve got left in the rack. Decent price and decent I/O with USB, serial and a slot-in for network expansion + 4 IEC outputs. Its powering everything in the rack and connected via USB to my main server which runs a NUT server that other machines can connect to. A calibration run (100-80%) puts the runtime at about 20 min. Long enough that I’m comfortable setting things to shut down when 20% capacity remains. Summary, I sleep better now.

The rack with the UPS at the bottom

NUT output

  • Clusterfck@lemmy.sdf.org
    link
    fedilink
    English
    arrow-up
    1
    ·
    9 months ago

    Living in the Midwest, I’ve never really dealt with a major power outage we didn’t expect. Power company will send out a (very rare) notice if they are doing anything that might bring down power and usually if a thunderstorm starts to get rough, we shut down anything important so power flicker/surges don’t hurt it.