The datacenter industry has planned build outs that will require them using 13-15% of the power in America even after they add their own filthy new generation.
I’m still in total despair over Trump killing that offshore wind farm that was near completion. It’s like he’s going out of his way to crush our hope for the future.
The datacenter industry has planned build outs that will require them using 13-15% of the power in America even after they add their own filthy new generation.
That’s insane.
The American power grid is so screwed.
I’m still in total despair over Trump killing that offshore wind farm that was near completion. It’s like he’s going out of his way to crush our hope for the future.
I thought you had just said concerns are overblown?