According to data from the Energy Information Administration (EIA), more than 20 gigawatts (GW) of battery capacity have been added to the US electric grid in the last four years. This rapid expansion is equivalent to the production of 20 nuclear reactors and is crucial for averting power disruptions, especially in states that rely significantly on intermittent renewable energy sources such as wind and solar.

  • reddig33@lemmy.world
    link
    fedilink
    arrow-up
    34
    arrow-down
    2
    ·
    1 month ago

    I’d like to see a cost comparison. I’m guessing all that battery storage cost less than the price of a nuclear reactor over its lifetime.

      • RvTV95XBeo@sh.itjust.works
        link
        fedilink
        arrow-up
        27
        arrow-down
        1
        ·
        30 days ago

        Not trying to be a “nuclear shill”, but it is worth mentioning from the article you linked:

        The 1.8 million solar panels are expected to generate up to 690 MW and they’re co-located with 380 MW of 4-hour battery energy storage (1,400 MWh).

        The capacity factor of solar is something around 25%, so that 690 MW solar array (even with batteries) produces about as much energy as ~160 MW nuclear… So 7x faster, but the costs are closer than you suggest. Solar is still cheaper because the O&M costs are minimal, but pretending 690 MW solar + 380 MW battery is equivalent to 1 GW nuclear is a bit disingenuous.

        • mosiacmango@lemm.ee
          link
          fedilink
          arrow-up
          15
          ·
          edit-2
          30 days ago

          That’s a solid critique. We can math it out more.

          So each 1.2GW reactor works out to be 17bil. Time to build still looks like 14 years, as both were started on the same time frame, and only one is fully online now, but we will give it a pass. You could argue it took 18 years, as that’s when the first proposals for the plants were formally submitted, but I only took into account financing/build time, so let’s sick with 14.

          For 17bil in nuclear, you get 1.2GW production and 1.2GW “storage” for 24hrs.

          So for 17bil in solar/battery, you get 4.8GW production, and 2.85gw storage for 4hrs. Having that huge storage in batteries is more flexible than nuclear, so you can provide that 2.85gw for 4 hr, or 1.425 for 8hrs, or 712MW for 16hrs. If we are kind to solar and say the sun is down for 12hrs out of every 24, that means the storage lines up with nuclear.

          The solar also goes up much, much faster. I don’t think a 7.5x larger solar array will take 7.5x longer to build, as it’s mostly parallel action. I would expect maybe 6 years instead of 2.

          So, worst case, instead of nuclear, for the same cost you can build solar+ battery farms that produces 4x the power, have the same steady baseline power as nuclear, that will take 1/2 as long to build.

      • EleventhHour@lemmy.world
        link
        fedilink
        arrow-up
        3
        arrow-down
        6
        ·
        edit-2
        1 month ago

        Yes, but one must also factor in the cost of the power source. Is it a solar or wind farm? Is it just off the grid? One way or another, the cost of the power source does factor into this. You know, because nuclear reactors, etc, generate power, but batteries merely store it.

    • Antitoxic9087@slrpnk.net
      link
      fedilink
      arrow-up
      4
      ·
      edit-2
      29 days ago

      Although renewable + bess still wins according to most recent studies on that matter, cost comparison between nuke and renewable / Bess is not that useful. Assumptions on the longevity of nuke reactors, for example, helps little if the fleet of reactors end up constantly break down and require repairment as in France and Belgium. So lcoe of nuke over long time span is highly uncertain and contingent; even in construction phase nuclear projects already entails higher risk in time and budget overrun than renewables. Plus the positive feedback loop of learning curve, evident in renewable and Bess, is not so visible for nuclear.

      What is more useful for sake of current policy discussion is deployment rate and scalability, which renewable plus batteries clearly wins.

    • Wanderer@lemm.ee
      link
      fedilink
      arrow-up
      7
      arrow-down
      1
      ·
      30 days ago

      I don’t think anyone really should have a problem with nuclear being built.

      Just as long as the government doesn’t have to pay for the construction, or for running costs including subsidising electricity or for the clean up costs. If a company wants to go ahead and pay for it I say let them.

      They wouldn’t because it would be financially stupid. But I wouldn’t be against it.

      • RubberDuck@lemmy.world
        link
        fedilink
        arrow-up
        2
        ·
        edit-2
        29 days ago

        The government should be building long term waste storage and mandating it’s use by the nuclear facilities at cost.

        • Wanderer@lemm.ee
          link
          fedilink
          arrow-up
          1
          ·
          29 days ago

          Yea I agree with that actually.

          But the point was when the cost is held by the companies it is a bad idea for them.

          • RubberDuck@lemmy.world
            link
            fedilink
            arrow-up
            1
            ·
            29 days ago

            True, the companies get subsidised to build meaning you already paid for a lot of the up front cost through your taxes and are later price gouged again. And once it’s over probably they stick the populace with the waste and decommissioning costs.

            Example in the Netherlands, we actually had a foundation setup to run the nuclear powerplant, and they had to reserve money for the decommissioning. Once the end of the reactors life was passed, the decommissioning was paid for from the foundation, the money that was left was paid to the shareholders. Turned out the decommissioning was 20 million more expensive… Guess who had to pay…